 Can my Construction Team be the Commissioning Agent? 

No. In KIKLOP’s opinion, independence is the cornerstone of providing the owner unbiased, uncompromised, energy-efficient, commissioned facilities. The last building we had commiss ioned failed, even though we had employed an individual as a comm issioning authority. Why did the process not work? KIKLOP believes that there are many people trying to be commissioning authorities while utilizing the services of the installing contractor to perform their own testing. KIKLOP’s approach is quite different. In order to perform proper commissioning, an in-house team of professional engineers and field test engineers need to oversee all field testing which is performed. 

Why should I buy comm issioning services, I already have a Design Team? 

As stated previously, independence is the cornerstone of commissioning. Therefore, the design engineer should not be the commissioning services provider. In addition, the most effective commissioning agents are those individuals who have significant experience in both design engineering and field testing. More often than not, design engineer’s employees lack the field testing experience necessary to make them effective commissioning agents. 

Will commissioning my building cost more money? 

Commissioning, since it is often not included, will increase the base cost of a project. However, the net savings obtained from: identifying and resolving deficiencies before they become major problems; preventing major errors and omissions before it is not economically feasible to correct; physically verifying that systems operate correctly and in accordance with the design intent; all of which are major benefits of commissioning, lowers the overall construction costs, significantly reduces change order claims, and ensures the lowest possible energy usage. From an overall project perspective, it is definitely more economical to purchase commissioning services than to not purchase them. 

What comm issioning services should I buy? 

No commissioning authority should provide a blanket program. KIKLOP, through years of experience, designs programs that are customized to meet the needs and requirements of the project. A program that provides the best value added services and a quality end result. If we only purchase design phase commiss ioning, will this provide a qua lity end product? No. Building failures can result from errors in any of the following; Design, Equipment Manufacture, Installation or Operations. By utilizing only Design phase commissioning you will reduce errors in this phase but have ignored three areas where potential costly mistakes have occurred resulting in increased energy consumption and maintenance/operational costs.

Our Articles

Our recent news and articles

1st PPP Hospital of TURKEY , Mersin Regional Hospital

1st PPP Hospital of TURKEY , Mersin Regional Hospital

https://www.youtube.com/watch?v=jMnwB35PGDM Mersin Integrated city Hospital opens door for public patients. The project will be named the first opened PPP structured Healthcare facility at Turkey....

More Info

BİLKENT INTEGRATED HEALTH CAMPUS; Europe's Largest

BİLKENT INTEGRATED HEALTH CAMPUS; Europe's Largest

"World's largest health complex built in single contract and Europe's largest health campus"      Location: The project is located in the Lodumlu region of the Çankaya metropolitan di...

More Info

Zenium Data Center Ready for its first client KOC System….

Zenium Data Center Ready for its first client KOC System….

ZENIUM Istanbul ONE Data Center is Turkey's first state-of-the-art facilities to offer wholesale data center solutions with 12,000 sq m of world-class, wholesale technical space over three buildin...

More Info

KIKLOPs MEGA PROJECTS

KIKLOPs MEGA PROJECTS

Istanbul New Airport - World biggest one roof air terminal building with a construction area of 1,450,000 sqm Bilkent Integrated City Hospital - Europe's biggest Healthcare Facility with a cons...

More Info

Over 3,5 million square meter Healthcare Projects

Over 3,5 million square meter Healthcare Projects

Over 3,5 million square meter Healthcare Projects encompassing circa 8,000 beds capacity under progress...   BİLKENT INTEGRATED CITY HOSPITAL Client: Ministry of Health-Turkey PPP Contractor ; DIA...

More Info

4 MAIN REASONS WHY HVAC COILS FAIL PRETERM

4 MAIN REASONS WHY HVAC COILS FAIL PRETERM

Coil Plugging: If filters are not changed or your HVAC coils cleaned properly in a timely manner, your coil will actually act as a filter. When dirt builds up on the coil, it will prevent heat transfe...

More Info

Commissioning Project Approach

Commissioning Project Approach

KIKLOP approach to how we would ensure that we provide a complete scope of commissioning services that achieves all required objectives, would be to initiate, as soon as possible after award of contra...

More Info

Istanbul New Airport awarded by World Architecture Festival

Istanbul New Airport awarded by World Architecture Festival

Istanbul New Airport, which is the greatest infrastructure project of the Republican history is awarded by World Architecture Festival in Future Project-Infrastructure category.   https://www.wo...

More Info

KIKLOP is now at Istanbul Grand Airport

KIKLOP is now at Istanbul Grand Airport

 KIKLOP pens the contract with the Joint Venture Cengiz-MNG-Limak-Kolin-Kalyon(CMLKK) for the Phase-1 Main Terminal Building Architectural/Interior Design services of the Istanbul 3rd Airport Project....

More Info

works completed for Capitol Vista

works completed for Capitol Vista

Developed by US based Dolphin Oversea Investments, The Capitol Vista Office Tower is distinguished from its surroundings by its unique design: a simple geometric glass volume encasing a stack of large...

More Info

Healthcare Facility Commissioning - 5 Tips to Success: What Every Owner Needs to Know.

Healthcare Facility Commissioning - 5 Tips to Success: What Every Owner Needs to Know.

Constructing a new healthcare facility poses a number of unique challenges that must be addressed at every phase of the project. In contrast to other construction projects, modern healthcare facilitie...

More Info

Hilltown Shopping Center opens the door

Hilltown Shopping Center opens the door

A project that will trigger competition!!   Rönesans Real Estate Investments mixed used project Hilltown Shopping Center opens doors to all visitors. Creating a city inside a city in the Maltepe...

More Info

Case Project : Long Stay Care Center - Bahrain

Case Project : Long Stay Care Center - Bahrain

MUHARRAQ MEDICAL CARE COMPLEX’S MISSION:  We believe all patients have unique needs and should live their life without illness or injury. With the support of the community and through our spirit of in...

More Info

Vakıfbank Sports Hall opens the door

Vakıfbank Sports Hall opens the door

KIKLOP Project Management has delivered  30.000 sqm multipurpose VAKIFBANK SPORTS COMPLEX  in Istanbul/Turkey  within only 15 months. The Complex , sponsored  by Vakifbank, is located in Istanbu...

More Info

UNDERSTANDING THE COMMISSIONING PROCESS OUTLINED IN NFPA:3 RECOMMENDED PRACTICE FOR COMMISSIONING AND INTEGRATED TESTING OF FIRE PROTECTİON AND LIFE SAFETY SYSTEMS

UNDERSTANDING THE COMMISSIONING PROCESS OUTLINED IN NFPA:3 RECOMMENDED PRACTICE FOR COMMISSIONING AND INTEGRATED TESTING OF FIRE PROTECTİON AND LIFE SAFETY SYSTEMS

Commissioning and Integrated Testing of Fire Protection and Life Safety Systems is an overall benefit for projects, with its no-nonsense approach that will assist in validating the intended system des...

More Info

Adana Integrated Health Campus is now fully operational.

Adana Integrated Health Campus is now fully operational.

Adana Integrated Health Campus is now fully operational. Adana Integrated Health Campus is providing its services to Adana, Hatay and Osmaniye provinces of Turkey. The project covers a total area o...

More Info