https://www.youtube.com/watch?v=jMnwB35PGDM
Mersin Integrated city Hospital opens door for public patients. The project will be named the first opened PPP structured Healthcare facility at Turkey.
Administration: The Ministry of Health of Turkey, Department of PPP
SPV : Mersin Entegre Sağlik Hizmetleri Yatirim ve İşletme A.Ş.
EPC Contractor: Dia Altyapi Yatirimlari ve İnşaat A.Ş.
Project Information
Total Closed Area : 331.168 m²
Total Land Area : 232.000 m²
Total Patient Bed Capacity : 1.259
Total Carpark Capacity : 112.883 m² - 3000 cars
Buildings in Scope
1. Main Hospital
Main Hospital Core
General Hospital
Cardiovascular Hospital
Children’s Hospital
Woman’s Hospital
Oncology Hospita
Psychiatric Hospital
2. Carpark
3. Technical Services Building
General Planning Criteria
Towers:
• Each tower has 3 levels of polyclinic rooms. It is planned to have 264 polyclinics.
• It is planned to have 138 intensive care units and 59 newborn intensive care units.
Core:
• At the basement it is planned to have carparks and electromechanical rooms.
• At level B1, carparks, laboratories, pharmacies,personnel areas, storage rooms,morg, physioteraphy, etc such
logistic spaces.
• At entry floor ; central emergency service and imaging units for all towers shall be located. Nuclear
medicine,radiation oncology, hemodialysis and chemotherapy are also at this level.
• First floor contains special pre/post-op rooms and central operation theatres , in addition to angiography, catetery
labs and endoscopy units.